Supply Ability & Additional Information
- Place of Origin:
- Fuan City, Fujian Province, China
- Productivity:
- 500000 Pieces
- Supply Ability:
- 50000 Pieces for every month
- Payment Type:
- L/C,T/T,D/P,Western Union
- Incoterm:
- FOB,CFR,CIF
- Certificate:
- CE, ISO9001
- HS Code:
- 8501520000
- Transportation:
- Ocean,Air
- Port:
- Fuzhou Port
Y2 Three Phase Industrial Electric Motor 100 HP
Y & Y2 series motor is totally enclosed and fan cooled 100HP 3 phase squirrel cage induction motor. 100 Hp Electric Motor is newly designed in conformity with the relevant rules of IEC&DIN42673 standards. Y2 Series Three Phase Induction Motor
AC Motors
Industrial Electric Motors are widely used in places where there doesn't exist combustible, explosive or corrosive gas, and without any special requirements, such as machine tools, pumps, fans, transport machinery, mixer, agriculture machinery and food machines, etc.
Electric Motor
Operating condition
· Ambient temperature: -15℃≤θ≤40℃
· Altitude: ≤1000m
· Protection class: IP44
· Insulation class: B/F,
· Rated voltage: 220V, other voltage on request
· Cooling type: IC 0141
· Duty: Continuous(S1)
· Rated frequency: 50HZ, other frequency on request.3 Phase Electric Motor
Note:10KW Electric Motor
The voltage and frequency could be made according to your requirements. If there is any question or need, welcome to contact us.
Packaging & Shipping
FAQ
Q: Do you offer OEM service?
A: Yes
Q: What is your payment term?
A: 30% T/T in advance, 70% balance when receiving B/L copy. Or irrevocable L/C.
Q: What is your lead time?
A: About 30 days after receiving deposit or original L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can apply for specific certificate for different country such as SONCAP for Nigeria, COI for Iran, SASO for Saudi Arabia, etc
Our Services
What we do:
1.Stamping of lamination
2.Rotor die-casting
3.Winding and inserting – both manual and semi-automatically
4.Vacuum varnishing
5.Machining shaft, housing, end shields, etc-
6.Rotor balancing
7.Painting – both wet paint and powder coating
8.assembly
9.Packing
10.Inspecting spare parts every processing
11.100% test after each process and final test before packing.